Free calculator, no sign-up
Power factor correction calculator: capacitor bank size
Capacitor bank rating in kvar to raise the power factor, Qc = P·(tan φ1 − tan φ2), with apparent power before and after correction. Free, no sign-up.
- Instant result
- Formula and standards shown
- On desktop and phone
Result
42.13kvarCapacitor bank Qc
- Apparent power before
- 125.0kVA
- Apparent power after
- 105.3kVA
Free during the beta, no credit card
Capacitor bank sizing kept with the installation
Here, the calculator is free and the result is gone when you close the page. In Reglova, it is attached to the work order on the right machine: you find it again at the next breakdown, and on audit day.
The CMMS software comparison, our gaps included- Attached to the work order with its inputs: the server recalculates it, it stays verifiable.
- On the technician's phone, even without a network.
- In the machine's history, for the next breakdown.
- The asset's nameplate data pre-fills the calculation.

When to correct the power factor
01
Size a capacitor bank before asking for a quote.
02
Free up capacity on a transformer close to its limit.
03
Check that an existing bank is still enough after adding motors.
Good to know
With variable speed drives on the network, harmonics often call for a detuned capacitor bank with reactors: check with the supplier.
Power factor correction formula: Qc = P·(tan φ1 − tan φ2)
Raising the power factor reduces the apparent power drawn, and so the current in the cables and the transformer. The calculator gives the capacitor bank rating, Qc = P·(tan φ1 − tan φ2), and the apparent power before and after correction.
Formula · Reference documents
Qc = P·(tan φ1 − tan φ2)
Electrical engineering ; Schneider Electric guide, reactive energy compensation
Inputs and accepted ranges
| Input | Unit | Accepted range | Example |
|---|---|---|---|
| Active power P | kW | 0.01 to 100,000 | 100 kW |
| Current cos φ | 0.01 to 1 | 0.8 | |
| Target cos φ | 0.01 to 1 | 0.95 |
Calculated results
- Capacitor bank Qckvar
- Apparent power beforekVA
- Apparent power afterkVA
Capacitor banks and switchboards inspected on schedule
- Breakdowns reported by QR code
- Work orders on the phone, even without a network
- Mandatory inspections reminded by email
- Audit file as a PDF, in one click
Free during the beta, no credit card