Skip to content

Free calculator, no sign-up

FMEA RPN calculator: severity × occurrence × detection

Rate severity, occurrence and detection on a 4, 5 or 10-level scale and get the RPN against your action threshold (IEC 60812). Free, no sign-up.

  • Instant result
  • Formula and standards shown
  • On desktop and phone

Pre-filled example

A failure mode rated severity 8, occurrence 5 and detection 3 on a 1 to 10 scale, with an action threshold set at 100.

Result

120Risk priority S × O × D

Action required
Yes
Scale maximum
1,000

Free during the beta, no credit card

What is FMEA?

FMEA (failure modes and effects analysis) is a structured, bottom-up method that lists the ways each part of a system can fail, the effect of each failure on the system and its causes. IEC 60812:2018 describes the method; when the failure modes are also ranked by criticality, the analysis is called FMECA. The usual ranking multiplies three ratings, severity, occurrence and detection, into a risk priority number (RPN).

Applied to equipment, an FMEA shows the maintenance team where preventive work pays for itself. A mode with a high RPN gets a periodic inspection, a sensor or a design change; one with a low RPN can be left to run to failure. The analysis is never finished once and for all: after each corrective action, or when the breakdown history contradicts a rating, the mode is rated again and its RPN moves.

Reference documents : IEC 60812:2018, Failure modes and effects analysis (FMEA and FMECA) ; AIAG and VDA, FMEA Handbook (2019)

Each RPN filed with the machine's work orders

Here, the calculator is free and the result is gone when you close the page. In Reglova, it is attached to the work order on the right machine: you find it again at the next breakdown, and on audit day.

The CMMS software comparison, our gaps included
  • Attached to the work order with its inputs: the server recalculates it, it stays verifiable.
  • On the technician's phone, even without a network.
  • In the machine's history, for the next breakdown.
Reglova · Calculations · Work order WO-AT01-04219
Silent video, 33 s: from the work order for an oil leak on a shear cylinder, the tightening torque of an M12 bolt, then "Attach to the work order". A step to tighten it to 93.1 N·m lands in the checklist (step text from the French demo data). Watch the video

When to rate failure modes in an FMEA

  1. 01

    Rank a machine's failure modes to decide where preventive maintenance should go.

  2. 02

    Check that a corrective action has brought a mode below the threshold.

  3. 03

    Compare ratings made with different scales (4, 5 or 10 levels).

Good to know

The number is only as good as the scale behind it: write down what each rating means (a stop of more than 4 hours, one failure a month…) before rating. A maximum severity often calls for action whatever the number.

Risk priority number: S × O × D and its scales

In an FMEA, each failure mode gets three ratings: its severity S, its occurrence O and its detection D, the likelihood that it goes undetected. Their product, the risk priority number, ranks the modes and points to those that require action. The calculation follows IEC 60812.

Formula · Reference documents

RPN = S × O × D

IEC 60812:2018

Inputs and accepted ranges
InputUnitAccepted rangeExample
Rating scale3 options1 to 10
Severity S1 to 108
Occurrence O1 to 105
Detection D1 to 103
Action threshold1 to 1,000100
Calculated results
  • Risk priority S × O × D
  • Action required
  • Scale maximum

From FMEA action to preventive plan in Reglova

  • Breakdowns reported by QR code
  • Work orders on the phone, even without a network
  • Mandatory inspections reminded by email
  • Audit file as a PDF, in one click

Free during the beta, no credit card